Resource Type

Journal Article 22

Year

2023 3

2022 4

2021 1

2020 2

2017 3

2016 2

2015 1

2011 1

2009 2

2005 1

2004 1

1999 1

open ︾

Keywords

Focused crawler 2

Ontology 2

Priority evaluation 2

Ant colony optimization 1

Construction equipment 1

Control policy 1

DWC-OVWP 1

Dynamic channel assignment 1

Ecotoxicity 1

Emerging contaminants 1

Emerging organic contaminants 1

Equipment assignment optimization 1

Hazard potential 1

Host information 1

Hypersonic-glide vehicle (HGV) 1

Interval type-2 fuzzy logic system (IT2FLS) 1

Intra-cell communication 1

Kalman filter 1

Layout design 1

open ︾

Search scope:

排序: Display mode:

Interval type-2 fuzzy logic based radar task priority assignment method for detecting hypersonic-glide Research Articles

Fanqing MENG, Kangsheng TIAN,maoximengruizhi@126.com,tiankangsheng@sohu.com

Frontiers of Information Technology & Electronic Engineering 2022, Volume 23, Issue 3,   Pages 488-501 doi: 10.1631/FITEE.2000560

Abstract: task method based on IT2FLS, the maneuver factor, speed, azimuth difference, distance, and initial priorityThe radar task priority is the output variable.Simulation results showed that the method based on IT2FLS has a higher precise tracking rate, mean initial priority

Keywords: Hypersonic-glide vehicle (HGV)     Phased-array radar     Interval type-2 fuzzy logic system (IT2FLS)     Priorityassignment    

Improved resilience measure for component recovery priority in power grids

Frontiers of Engineering Management 2021, Volume 8, Issue 4,   Pages 545-556 doi: 10.1007/s42524-021-0161-5

Abstract: The recovery priority of failed components after a disaster is determined according to the influence

Keywords: resilience measure     power grid     importance measure     component recovery    

Simulation model based on Monte Carlo method for traffic assignment in local area road network

Yuchuan DU, Yuanjing GENG, Lijun SUN

Frontiers of Structural and Civil Engineering 2009, Volume 3, Issue 2,   Pages 195-203 doi: 10.1007/s11709-009-0032-3

Abstract: circumstance characteristic and the data availability of a local area road network, a new model for traffic assignmentThe formulation for local area road network assignment problems is proposed on the assumption of randomThe traffic assignment model based on the Monte Carlo method has been used in traffic analysis for an

Keywords: traffic assignment     local area road network     turning ratio     Monte Carlo method    

Optimization of multi-objective integrated process planning and scheduling problem using a priority based

Muhammad Farhan AUSAF,Liang GAO,Xinyu LI

Frontiers of Mechanical Engineering 2015, Volume 10, Issue 4,   Pages 392-404 doi: 10.1007/s11465-015-0353-y

Abstract: The proposed algorithm uses a set of dispatching rules coupled with priority assignment to optimize the

Keywords: integrated process planning and scheduling (IPPS)     dispatching rules     priority based optimization algorithm    

Study on the Priority of Food Safety Science and Technology in China

Wei Yimin,Wu Yongning,Zhou Naiyuan,Pan Jiarong

Strategic Study of CAE 2005, Volume 7, Issue 11,   Pages 1-4

Abstract: food safety, and risk assessment is the key technology of food safety, it is suggested to be the first priority

Keywords: food safety     science and technology of food safety     strategy of food safety     priority of food safety    

Emerging contaminant control: From science to action

Frontiers of Environmental Science & Engineering 2022, Volume 16, Issue 6, doi: 10.1007/s11783-022-1559-y

Abstract: Priority ECs should be screened for environmental management.

Keywords: Emerging contaminants     Priority pollutants     PPCPs     POPs     Control policy    

Corrigendum to “Emerging Organic Contaminants in Chinese Surface Water: Identification of Priority Pollutants Corrigendum

Mengmeng Zhong, Tielong Wang, Wenxing Zhao, Jun Huang, Bin Wang, Lee Blaney, Qingwei Bu, Gang Yu

Engineering 2023, Volume 31, Issue 12,   Pages 139-140 doi: 10.1016/j.eng.2022.09.001

A robust object tracking framework based on a reliable point assignment algorithm Article

Rong-feng ZHANG, Ting DENG, Gui-hong WANG, Jing-lun SHI, Quan-sheng GUAN

Frontiers of Information Technology & Electronic Engineering 2017, Volume 18, Issue 4,   Pages 545-558 doi: 10.1631/FITEE.1601464

Abstract: To overcome these difficulties, a reliable point assignment (RPA) algorithm based on wavelet transform

Keywords: Local maximal wavelet coefficients     Reliable point assignment     Object tracking     Tracking learning detection    

Airline planning and scheduling: Models and solution methodologies

Lei ZHOU, Zhe LIANG, Chun-An CHOU, Wanpracha Art CHAOVALITWONGSE

Frontiers of Engineering Management 2020, Volume 7, Issue 1,   Pages 1-26 doi: 10.1007/s42524-020-0093-5

Abstract: Our research framework is anchored on three major problems in the airline scheduling, namely, fleet assignment

Keywords: airline planning     fleet assignment problem     aircraft routing problem     crew pairing problem     crew rostering    

Cooperative channel assignment for VANETs based on multiagent reinforcement learning Research Articles

Yun-peng Wang, Kun-xian Zheng, Da-xin Tian, Xu-ting Duan, Jian-shan Zhou,ypwang@buaa.edu.cn,zhengkunxian@buaa.edu.cn,dtian@buaa.edu.cn,duanxuting@buaa.edu.cn

Frontiers of Information Technology & Electronic Engineering 2020, Volume 21, Issue 7,   Pages 1047-1058 doi: 10.1631/FITEE.1900308

Abstract: However, channel assignment under vehicular direct communication scenarios faces mutual influence of

Keywords: Vehicular ad-hoc networks     Reinforcement learning     Dynamic channel assignment     Multichannel    

Web-based construction equipment fleet management system: cost-effective global and local allocation

Hakob AVETISYAN, Miroslaw SKIBNIEWSKI

Frontiers of Engineering Management 2017, Volume 4, Issue 1,   Pages 76-83 doi: 10.15302/J-FEM-2017012

Abstract: Over the last two decades, construction contractors have been gradually making more investments in construction equipment to meet their needs associated with increasing volumes of construction projects. At present, from an operational perspective, almost all contractors pay more attention to maintaining their equipment fleets in well-sustained workable conditions and having a high accessibility of the necessary equipment pieces. However, such an approach alone is not enough to maintain an efficient and sustainable business. In particular, for large-scale construction companies that operate in multiple sites in the U.S. or overseas, the problem extends to an optimal allocation of available equipment. Given the current state of the construction industry in the U.S., this problem can be solved by geographically locating equipment pieces and then wisely re-allocating them among projects. Identifying equipment pieces geographically is a relatively easy task. The difficulty arises when informed decision-making is required for equipment allocation among job sites. The actual allocation of equipment should be both economically feasible and technologically preferable. To help in informed decision-making, an optimization model is developed as a mixed integer program. This model is formed based on a previously successfully developed decision-support model for construction equipment selection. The proposed model incorporates logical strategies of supply chain management to optimally select construction equipment for any construction site while taking into account the costs, availability, and transportation-related issues as constraints. The model benefits those responsible for informed decision-making for construction equipment selection and allocation. It also benefits the owners of construction companies, owing to its cost-minimization objective.

Keywords: Construction equipment     Equipment assignment optimization     Web-based asset management    

Economics of energy strategy with priority on conservation

Zhou Dadi

Strategic Study of CAE 2011, Volume 13, Issue 6,   Pages 11-18

Abstract: conservation and intensity decrease were analyzed,and the economic rationality of energy conservation priority

Keywords: energy strategy     energy conservation and intensity decrease     economic effectiveness of energy conservation     scientific development     economics    

Consideration on seismic safety of dams in China after the Wenchuan Earthquake

Chen Houqun

Strategic Study of CAE 2009, Volume 11, Issue 6,   Pages 44-53

Abstract: The strategic priority of dam safety for large dam in China and the corresponding tactics to overcome

Keywords: Wenchuan Earthquake     safety of dams     reservoir earthquake     strategic priority    

Exploration of the Development Road for Chinese Liquid Rocket Engine in 21st Century

Wang Heng

Strategic Study of CAE 1999, Volume 1, Issue 2,   Pages 1-5

Abstract: Propulsion must enjoy priority in research and development of launch vehicles.

Keywords: propulsion having top priority     liquid rocket engine     heavy lift launch vehicle     rocket spaceplane    

Anovel resource optimization scheme for multi-cellOFDMArelay network Article

Ning DU,Fa-sheng LIU

Frontiers of Information Technology & Electronic Engineering 2016, Volume 17, Issue 8,   Pages 825-833 doi: 10.1631/FITEE.1500294

Abstract: Specifically, we jointly optimize subcarrier assignment, subcarrier pairing, and power allocation to

Keywords: Intra-cell communication     Two-way relay     Subcarrier assignment     Subcarrier pairing    

Title Author Date Type Operation

Interval type-2 fuzzy logic based radar task priority assignment method for detecting hypersonic-glide

Fanqing MENG, Kangsheng TIAN,maoximengruizhi@126.com,tiankangsheng@sohu.com

Journal Article

Improved resilience measure for component recovery priority in power grids

Journal Article

Simulation model based on Monte Carlo method for traffic assignment in local area road network

Yuchuan DU, Yuanjing GENG, Lijun SUN

Journal Article

Optimization of multi-objective integrated process planning and scheduling problem using a priority based

Muhammad Farhan AUSAF,Liang GAO,Xinyu LI

Journal Article

Study on the Priority of Food Safety Science and Technology in China

Wei Yimin,Wu Yongning,Zhou Naiyuan,Pan Jiarong

Journal Article

Emerging contaminant control: From science to action

Journal Article

Corrigendum to “Emerging Organic Contaminants in Chinese Surface Water: Identification of Priority Pollutants

Mengmeng Zhong, Tielong Wang, Wenxing Zhao, Jun Huang, Bin Wang, Lee Blaney, Qingwei Bu, Gang Yu

Journal Article

A robust object tracking framework based on a reliable point assignment algorithm

Rong-feng ZHANG, Ting DENG, Gui-hong WANG, Jing-lun SHI, Quan-sheng GUAN

Journal Article

Airline planning and scheduling: Models and solution methodologies

Lei ZHOU, Zhe LIANG, Chun-An CHOU, Wanpracha Art CHAOVALITWONGSE

Journal Article

Cooperative channel assignment for VANETs based on multiagent reinforcement learning

Yun-peng Wang, Kun-xian Zheng, Da-xin Tian, Xu-ting Duan, Jian-shan Zhou,ypwang@buaa.edu.cn,zhengkunxian@buaa.edu.cn,dtian@buaa.edu.cn,duanxuting@buaa.edu.cn

Journal Article

Web-based construction equipment fleet management system: cost-effective global and local allocation

Hakob AVETISYAN, Miroslaw SKIBNIEWSKI

Journal Article

Economics of energy strategy with priority on conservation

Zhou Dadi

Journal Article

Consideration on seismic safety of dams in China after the Wenchuan Earthquake

Chen Houqun

Journal Article

Exploration of the Development Road for Chinese Liquid Rocket Engine in 21st Century

Wang Heng

Journal Article

Anovel resource optimization scheme for multi-cellOFDMArelay network

Ning DU,Fa-sheng LIU

Journal Article